Early-Stage Power Developments
Assets Under Development

Darkhan, Mongolia
Mongolia — 100 MW Hybrid
Ultra-low off-peak power (~$0.03/kWh), dual 220 kVA transmission lines, and a natural-gas pipeline—making it one of the strongest hybrid power locations in Asia. The 200-acre site supports grid, solar, gas, and BESS.​​
-
Delivery System Hybrid, Gas/Solar
-
Power Delivery 100 MW
-
Stage Early w/ Path to IC
-
First Prod. Est. Q4 2026

Saskatchewan, Canada
Edenwold — 200 MW Hybrid
Hybrid Gas + Solar + Grid
with Permit in place
100-acre + site housing development. Supports community energy, cogeneration & strategic partners.
-
Delivery System Hybrid, Gas/Solar
-
Power Delivery 200 MW
-
Stage Early w/ Path to IC
-
First Prod. Est. 2027

Malaysia University
AI Compute & Hybrid Power Partnership
Collaborative development with 2 leading Malaysian universities. Dedicated compute allocation for education, R&D, and AI training. Greenfield land available for data centre + power generation buildout.​​​
-
Delivery System Hybrid, Gas/Solar
-
Power Delivery 100 MW
-
Stage Greenfield
-
First Prod. Est. Q4 2026

Johor, Malaysia
Greenfield Data & Power Development Zone
Grid + Gas. Located in a high-growth Southeast corridor
Ideal for large-scale compute & digital infrastructure. Backlog of regional data demand creates accelerated offtake.
-
Delivery System Hybrid, Gas/Solar
-
Power Delivery 50 MW
-
Stage Greenfield
-
First Prod. Est. Q4 2026

Lagos, Nigeria
Fintech Power Hub
Surveying greenfield land for large-scale Solar + Gas hybrid power generation. Positioning to serve Nigeria’s fast-growing fintech & digital economy. Strong demand from local industry + regional power shortfalls.
-
Delivery System Hybrid, Gas/Solar
-
Power Delivery 100 MW
-
Stage Greenfield
-
First Prod. Est. 2027

Minas, Gerais
75 MW F Solar and Compute
50-acre permitted site with Solar + Grid interconnection
Low-cost power with off-peak rates near $0.03/kWh. Strong regulatory support for renewable generatio
-
Delivery System Hybrid, Grid/Solar
-
Power Delivery 75 MW
-
Stage
-
First Prod. Est.
-
Target per MW